Glebe Barn

Construction of Drainage Mound

The Problem

Due to an existing discharge being subject to a land dispute, an alternative discharge solution was required. Porosity testing revealed the ground to be unsuitable for installation of a drainage field.

Work undertaken

  • Install new final effluent pumping station on the back of existing Treatment Plant
  • Design and construct drainage mound
  • Liaise with building control to ensure full certification upon completion